(08) 9302 7800

Jet Fuel Valve and Sump Pit Repair with Chesterton ARC Products!

Intro

Chesterton products – Chesterton ARC Industrial Coatings

Chesterton

 

 

Jet fuel control valves at an airport were installed in underground chambers which often experience floods of rainwater and run-off. This flooding of rain and contaminated liquids caused rust and potential erosion and leaks, so the customer wanted to extend the life of the valves by protecting against contaminated water. Chesterton experts created a unique combination of Chesterton ARC products, that could be easily installed and, after seven years, are still holding up in great condition.

Products featured in this case study:

Challenge

Issue
Jet Fuel Control Valves at Manila International Airport are installed in underground chambers where rainwater and run-off water can fill up inside the chamber, causing the cast iron valve body to rust over time.

This results in a potential for rust to erode the housing and create a fuel leak.

Root Cause
Ingress of water and poor quality of coating to protect the valve body.

Goal
Extend the life of the valves by protecting the body
against contaminated water.

Fuel valve before coating.

Solution

After sandblasting the valve and pit walls, the inspection revealed no damage to the metal parts. Therefore, two coats of ARC 855 were applied. The concrete walls of the pit / sump were coated with ARC 797 / CS4 to protect against water penetration and potential corrosion of the reinforcement.

After seven years, the coating is still in excellent condition, with only one need for some cleaning.

ARC 855
100% solids, ceramic reinforced, thin film coating to protect metal against chemicals and corrosion.

ARC 797
100% Solids, low viscosity, fast penetrating, modified epoxy primer sealer.

ARC CS4
100% solids, highly chemical resistant and wear resistant, low viscosity, thin film 100% Novolac epoxy.

Chesterton ARC 855.

Results

Client Reported
Very happy with the result – five valves and sump pits were coated, and all are in excellent condition after seven years in service.

ROI
This was a preventative maintenance operation to ensure that the valve bodies did not leak due to water erosion over time.

If the valve and pit were left as it is, the valve would need to be replaced within two years (giving a total of 5 years of life). Thanks to the application of ARC coating, it is estimated that the valves will not need an overhaul for another five years (giving a total of 16 years of life).

Fuel valve after ARC coating.

Fuel valve after seven years.

About Us

Chesterton

Chesterton® is a world leader in helping process industry companies and manufacturers improve the reliability and efficiency of their rotating, stationary, and fluid power equipment platforms. We are known across a wide range of industries for our award-winning pump and valve sealing solutions, applications expertise, equipment maintenance and wear-prevention products, and knowledgeable hands-on local service​.

Mentioned in the case study:

Advance Surface Protection Specialist

Exclusive Distributor of Chesterton ARC Products in the Philippines.

 

 

 

 

 

® Registered trademark owned by A.W. Chesterton Company
Case Issued 07/21

 

Back to Case Studies

We are here to help - Contact Us

Contact Us